Blog

Technical notes

Operational notes, maintenance guides and system updates, written by the HUBER technical team.

Management

What to look at in the week's feeding reports

Sample article. Which indicators to review and how often.

Read article
Freshwater

Preventive maintenance routine before winter

Sample article. Inspection ahead of the most demanding season.

Read article
Software

How to schedule daily rations in Feeder TK

Sample article. The five rations per tank and their parameters.

Read article
Software

Automatic refilling: how the night shift is eliminated

Sample article. What changes in the operation when hopper refilling is automated.

Read article
Seawater

Doser calibration on barges

Sample article. How often to calibrate and how to read the history.

Read article
Seawater

Five signs that a doser needs servicing

Sample article. Early symptoms worth catching.

Read article

Keep up with aquaculture technology

Technical updates, case studies and news. No spam.

Add my details (optional)
Contact

Tell us about
your project

Write to us with the type of site, the number of tanks or cages and the feed volume. We will reply with a technical proposal.

Sales

ventas@huber.cl · +56 00 000 0000

Technical support

soporte@huber.cl · +56 00 000 0000

Plant

Puerto Varas, Región de Los Lagos

Support on WhatsApp